University
ITS Network Master Plan
Wednesday,
July 23, 2003
Main Document:
University ITS NMP (Final Draft -
July 23rd, 2003)
Click here
to download the entire document including attachments.
Attachments A1 & A2:
- Diagram:
Current state of installed networking hardware by building.
- A1 is
for Storrs; A2 is for the Depot and Regional campuses.
- GREEN denotes hardware that complies with
UITS’s current standard of 10/100MB switches with GB uplinks and VLAN
capabilities. RED denotes all hardware that does not comply.
Attachments B1 & B2:
- Diagram:
Current state of telecommunication rooms by building
- B1 is
for Storrs; B2 is for the Depot and Regional Campuses.
- GREEN denotes rooms that comply with UITS’s
current standard of dedicated rooms, sufficiently sized and with proper
environmentals. These rooms
include relay racks and patch panels for LAN terminations. RED
denotes all rooms that do not comply.
Attachments C1 & C2:
- Diagram:
Current state of telecommunications cabling by building.
- C1 is
for Storrs; C2 is for the Depot and Regional Campuses.
- GREEN denotes cabling that complies with UITS’s
current standard of Category 5E cabling for both “voice” and “data”
connections. YELLOW and RED denote all cabling that does not comply.
Attachments D1 & D2:
- Diagram:
Buildings that are compliant with UITS’s current standards.
- D1 is
for Storrs; D2 is for the Depot and Regional Campuses.
- GREEN denotes all buildings that meet all three
of the above-mentioned criteria. RED
denotes all non-compliant buildings.
Attachment D3:
- Spreadsheet:
Detailed listing of buildings that are compliant with UITS’s current
standards on the Storrs and Depot Campuses.
Attachments F1 & F2:
- Spreadsheet:
Detailed summaries of the budgetary estimates to upgrade the University
Network.
Attachments G1 & G2:
- Spreadsheet:
Detailed breakdown of “data” port counts by building.
- G1
& G2 include proposed growth totals and proposed collapse point
locations with fiber types.
Attachment H:
- Spreadsheet:
Proposed planning and implementation timelines for Network upgrade.
Attachment I1:
- Document:
Minimum baseline for future Networking services.
Attachment I2:
- Spreadsheet:
A detailed plan to upgrade networking hardware only.
Additional Attachments:
Attachment J:
- Diagram: Logical representation of proposed
core/distribution sites for the Storrs and Depot campuses.
Attachment K:
- Diagram: Proposed locations for core and
distribution sites on the Storrs and Depot campuses.
Attachment L:
- Spreadsheet: Detailed breakdown of buildings by
proposed collapse points for the Storrs and Depot campuses.